Penentuan Waktu Baku menggunakan Stopwatch Time Study sebagai Dasar Analisis Kapasitas Produksi Bandeng Gepuk pada UMKM Olahan Bandeng C73
Sari
Kata Kunci: Stopwatch Time Study, Waktu Baku, Kapasitas Produksi, Produktivitas Kerja, UMKM Olahan Pangan
Teks Lengkap:
Download PDFReferensi
Arifa, I., Choiri, A., Wibowo, W., & Azizah Panggabean, N. (2025). Peran UMKM dalam Meningkatkan Perekonomian Nasional (Vol. 4, Number 4).
Asmadi, D., Erwan, F., Rauzah, S., & Lufika, R. D. (2023). Analisis Kapasitas Produksi Parfum Neelam dengan Metode Time Study. Performa: Media Ilmiah Teknik Industri, 22(1), 50. https://doi.org/10.20961/performa.22.1.74462
Asyraaf, H., Bakar, A., Ahmad, A. H., Kiat, T. S., Osman, S. A., & Osman, S. A. (2026). Enhancing Manufacturing Productivity through Refined Work-Study Techniques: A Critical Review of Allowance Factors in Time Study. Journal of Advanced Research Design Journal Homepage: Journal of Advanced Research Design, 142, 177–195. https://doi.org/10.37934/ard.142.1.177195
Dwi Permana, W., Bayhaqi, I., Handayani, C., Studi, P., Industri, T., Teknologi, S. T., & Jambi, N. (2022). JuTMI Jurnal Teknik Mesin dan Industri Perancangan Operation Process Chart Dan Pengukuran Waktu Baku Dengan Metode Stopwatch Time (Vol. 1, Number 1). http://jutmi.stiteknas.ac.id/index.php/
Fathwan, A., & Kholidasari, I. (2022). ANALISIS PRODUKTIVITAS BERDASARKAN WAKTU STANDAR DENGAN METODE TIME STUDY DI USAHA MIKRO KECIL DAN MENENGAH (UMKM).
Ferdinan Suryadi, R. (2023). PERAN UMKM DALAM MENDORONG PERTUMBUHAN EKONOMI LOKAL STUDI KASUS DI INDONESIA. Jurnal Central, 1 No. 9. http://centralpublisher.co.id
Heizer, Jay., Render, Barry., & Munson, Chuck. (2020). Operations management : sustainability and supply chain management. Pearson.
Masniar, M., Marasabessy, U. R., Astrides, E., Asih Ahistasari, Nur Wahyudien, M. A., & Rachmadhani, M. M. (2023). Analysis of Work Measurement Using the Stopwatch Time Study Method at PTEA. Journal of Industrial System Engineering and Management, 2(1), 23–31. https://doi.org/10.56882/jisem.v2i1.14
Nur, M., & Adilla Frenita, Z. (2024). ANALISIS BEBAN KERJA DALAM PENENTUAN KEBUTUHAN PEKERJA YANG OPTIMAL DENGAN MENGGUNAKAN METODE FTE DAN WLA (Studi kasus: PT. Kunango Jantan). SPECTA Journal of Technology, 8(2), 113–125. https://doi.org/10.35718/specta.v8i2.1117
Purbasari, A., Sumarya, E., Mardhiyah, R., Industri, T., Teknik, F., & Kepulauan, U. R. (2023). PENERAPAN METODE STUDI WAKTU DAN GERAK PADA PROSES PACKING DI PT. ABC. Sigma Teknika, 6(2), 290–299.
Ramadhan, S. C. R., & Hartati, V. (2024). Identification of Standard Times to Determine Production Capacity: A Case Study (pp. 184–191). https://doi.org/10.2991/978-94-6463-618-5_20
Ridho Mauludi, A., & Puspanantasari Putri, E. (2025). Analisis Waktu Standar Produksi dengan Stopwatch Time Study Guna Penentuan Jumlah Tenaga Kerja. 12(1), 399–409.
Wahyuda, M. F., & Setiawannie, Y. (2023). Standard Time Determination Of Ship Propeller Molding In CV. Dravitindo Kreasi Utama With The Stopwatch Time Study Method. In Maret (Vol. 1, Number 1).
Yudha Pradana, A., & Pulansari, F. (2021). ANALISIS PENGUKURAN WAKTU KERJA DENGAN STOPWATCH TIME STUDY UNTUK MENINGKATKAN TARGET PRODUKSI DI PT. XYZ. In Juminten : Jurnal Manajemen Industri dan Teknologi (Vol. 02, Number 01).
DOI: https://doi.org/10.37531/mirai.v11i2.12233
Refbacks
- Saat ini tidak ada refbacks.



